DOSECC HYBRID CORING SYSTEM PHOTOS
DHCS mounted on Nabors Rig #202 at the Long Valley Scientific Drilling Project located near Mammoth Lakes, California


A photo of the DHCS setup at Mammoth Lakes, California during Summer ‘98 drilling.
The driller’s station containing the control console for controlling and monitoring drilling.


A photo of the shop which houses tools and spare parts in a 20 foot shipping container.
The hydraulic power pack.


Core logging at Mammoth Lake Project. The shop container is located in the background of this photo.
IRIS Real-Time Earthquake Map
[Homepage] [Directory] [What's New] [Projects] [Newsletter] [Workshops & Conferences] [Education and Outreach] [Equipment] [Publications] [Health and Safety] [Cool Links!]
©2008 DOSECC All rights reserved
Continental Scientific Drilling Town Hall Meeting
December 15, 2008
6:00 to 7:30 p.m.
Intercontinental Hotel
San Francisco, CA

View Barge Launch and Night Shift videos from Lake Potrok Aike drilling project

Follow the drilling progress at ICDP’s
Lake Potrok Aike website

Learn more about the project at ICDP’s
Lake E website