DOSECC HYBRID CORING SYSTEM PHOTOS

DHCS mounted on Nabors Rig #202 at the Long Valley Scientific Drilling Project located near Mammoth Lakes, California

rigphoto
Fullrig

A photo of the DHCS setup at Mammoth Lakes, California during Summer ‘98 drilling.

The driller’s station containing the control console for controlling and monitoring drilling.

!rigfloo
Shop

A photo of the shop which houses tools and spare parts in a 20 foot shipping container.

The hydraulic power pack.

a_Generator
Core

Core logging at Mammoth Lake Project. The shop container is located in the background of this photo.

DHCS Rig Photos

33rd International Geological Congress
6–14 August 2008
Oslo, Norway

IRIS Real-Time Earthquake Map

Cool Links!
DOSECC

[Homepage] [Directory] [What's New] [Projects] [Newsletter] [Workshops & Conferences] [Education and Outreach] [Equipment] [Publications] [Health and Safety] [Cool Links!]

©2007 DOSECC All rights reserved

iris map
33rd IGC Meeting
DOSECC 11th Annual large blue3 sidebar

DOSECC Workshop
3–5 June 2007
Washington, DC